BMW Showroom
ASG Scope of works:
To provide a complete bespoke design and installation of the architectural metalwork package; ranging from the high specification stainless steel internal 1st floor balustrade to the modular galvanised balustrading within the exterior service areas.
Design, supply and installation of architectural metalwork;
- High specification stainless steel balustrade with structural glass infill panels to the 1st floor and feature staircase.
- Polyester powder coated balustrade incorporating stainless steel handrail to the service viewing area.
- External modular galvanized balustrade systems within the valeting bays.
- Stainless steel bump rails to the vehicle lift and 1st floor showroom area.
The Statistics
- Client Name PDR Construction Limited
- Location Leeds road/Thistle street
Huddersfield
HD1 ENN - Construction Costs£85,000.00
- Size of project 137,670 sqft