Clements Construction - LOAF Batley

ASG Fabrications were commissioned by Clements Construction to undertake a metalwork and structural steel package for its new store in Batley, West Yorkshire

Works to alter an old Cotton Mill used as a storage warehouse into a two-floor sales area. Works entailed a vast amount of temporary works to hold the old structure in place whilst taking out the ground floor front elevation which consisted of 500mm thick stone walls. 


New footings were excavated and cast to take new internal structural columns and the new steel support structure to form the new openings to the ground floor facade. Stone walls rebuilt around the new steel frames. Internally a new Atrium was formed where removal of old cast iron columns and large section timber beams was necessary and new steel columns and beams introduced to form the new opening.

Client:

Clements Construction

Project Value:

£128,414.55

Scope of Works

  • Temporary Supports Front Elevation

  • Low Level Wall Supports

  • Plate Test Grillage Steel

  • Front Elevation Steelwork

  • Escape Stair and Balustrade

  • Walkway Support Steel

  • Lift Shaft Steelwork

  • Feature Cranked Stair

  • Balustrade to Feature Stair and Walkway